Total quality management in construction
Total quality management (TQM) is a theory of management the purpose of which is to improve an organisation’s ability to deliver quality to its customers on a continuously improving basis.
There are several differences between TQM and a traditional management system. TQM is a process-oriented as opposed to a result-oriented approach, and prioritises quality, flexibility and services rather than cost and technical efficiency. TQM involves a more horizontal organisational structure rather than the traditional vertical management structure. TQM presumes that profits follow quality and not vice versa.
As a philosophy, TQM is more associated with manufacturing and service industries, although has also been applied to construction as clients increasingly demand a high standard of delivery for large and complex buildings.
Although in construction, delays and defects can arise that are unavoidable, far more so than in a more controlled manufacturing environment, the application of TQM requires that the employee’s mindset be shifted from one of just monitoring to continually looking for opportunities to make improvements. TQM can be applied in construction as a way of approaching the conception, visualisation and achievement of goals to ensure quality and productivity, with an emphasis on innovation and new technology.
While there is no standard method of applying TQM, there are a number of typical elements:
- The customer is the ultimate user, and wants a quality product at a reasonable price.
- Feedback from customers should be analysed and implemented where necessary.
- Top management should lead well with vision and commitment.
- Employees should be encouraged and rewarded for good performance.
- Training should be provided regularly to upgrade the skills of employees.
- Conflicts should be avoided, and teams should work in unison toward a common goal.
The basic steps in implementation of TQM are as follows:
- The client should give a commitment regarding quality.
- A project quality assurance plan should be prepared for all work levels.
- A process approach should be developed toward TQM.
- Employees should be made aware of, and educated about TQM.
- Employee involvement should be promoted and encouraged.
- Steps should be taken to ensure continuous improvement can be made.
- Quality plans and performance should be measured and reviewed.
Some of the benefits that can be derived from TQM include; reduction in quality costs, higher levels of employee and client satisfaction, less remedial work, fewer delays, and a closer relationships with subcontractors and suppliers.
A major limitation of TQM is the time and resources required to establish the correct environment and organisational culture.
[edit] Related articles on Designing Buildings Wiki
- Commercial management.
- Construction management: outline work plan.
- Improving quality in the built environment.
- Leadership styles.
- Lean construction.
- Pareto analysis.
- Performance management plan.
- Plan, Do, Check, Act (PDCA).
- Project quality plan PQP.
- Quality control.
- Quality in construction projects.
- Quality manuals and quality plans.
- Ten principles for procuring better outcomes.
- Value management.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February